Today (27th), the expressway from Yunlong County, Dali Prefecture, Yunnan Province to Lanping Bai Pumi Autonomous County, Nujiang Prefecture, Yunnan Province was completed and opened to traffic. This is also the first expressway from Lanping Bai Pumi Autonomous County.

Yunlan Expressway starts from the north side of Guanping Township, Yunlong County, connects to Dali to Yangbi to Yunlong Expressway, and ends at Dagongdian, Jinding Town, Lanping Baipumi Autonomous County, and is connected to the end point of Hejianlan Expressway.
The main line of the project is 71.567 kilometers long and is built according to the technical standards of two-way four-lane expressways. The design speed is 80 kilometers per hour. There are 68 bridges, 12 tunnels, and the bridge-tunnel ratio is 61.8%. After the project is completed and opened to traffic, the driving time in Lanping and Yunlong will be shortened from 1 hour and 40 minutes to 50 minutes.

Yunlan Expressway is invested and constructed by Yunnan Jiantou Group. It is an important part of the "Dali-Yangbi-Yunlong-Lanping" ring line. It is of great significance to promote Nujiang and Dali to consolidate and expand the results of poverty alleviation, national unity and progress, and to ensure people's livelihood and well-being. It will benefit more than 300,000 people of all ethnic groups along the route.
(Reporter Li Tengfei and Zhang Ruyao of the General Station)

