This newspaper, Beijing, February 22 (Reporter Wang Hao) The Ministry of Water Resources recently issued and implemented the "Plan for the 2025 Water Resources of the Beijing-Hangzhou Grand Canal", and the full stimulation of the Beijing-Hangzhou Grand Canal was fully launched in 2025.
The 2025 water replenishment plan will last until the end of June, with the north section of the Yellow River of the Beijing-Hangzhou Grand Canal as the main connecting route, involving four provinces and cities, Beijing, Tianjin, Hebei and Shandong, and flowing through 8 prefecture-level administrative regions and 31 county-level administrative regions.
This water replenishment will optimize the allocation and dispatch of water supply for the emergency water supply project of the north extension of the East Line of the South-to-North Water Diversion East, local water, yellow water diversion, Luan water diversion, recycled water and rainwater and flood water. It is expected to provide 556 million cubic meters of water replenishment, of which 529 million cubic meters of water enter the Grand Canal, the total length of the water replenishment line is 1,274 kilometers, and the irrigation area of 460,000 mu of deep groundwater is replaced.

