ENGLISH English Channel
You are here: English > News > Full Story
Jakarta-Bandung high-speed railway marks its third anniversary and has carried more than 18 million passengers
2026-10-17 Source: cctv.com

On October 17 this year, Indonesia’s Jakarta-Bandung high-speed railway has been in operation for three years.In the past three years, the Jakarta-Bandung high-speed railway has operated a total of 58,666 multiple trains, carrying more than 18 million passengers, operating safely for more than 8.9 million kilometers, and the train punctuality rate reached 99.4%.

The Jakarta-Bandung high-speed railway has a total length of 142.3 kilometers and a maximum operating speed of 350 kilometers per hour, compressing the travel time from Jakarta to Bandung from more than three hours to 46 minutes.With the increase in passenger flow, the average number of daily trains has increased from 14 in the initial period to 62 in the peak period, with a maximum of 26,770 passengers in a single day.

Over the past three years, the China-Indonesia operations team has continued to optimize transportation organization and passenger services, and launched services such as floating fares, frequent flyer cards, and ticket changes.So far, a total of 47,577 frequent flyer cards have been sold.

The Jakarta-Bandung high-speed rail also drives the development of tourism, catering, retail and other industries along the route.As of now, there are 117 merchants at the stations along the line, including 29 small, medium and micro enterprises.Since the opening of the Jakarta-Bandung high-speed railway, it has transported and served more than 960,000 international passengers in Indonesia, promoting tourism consumption and regional economic development along the route.

In terms of safe operation, the China-Indonesia operation team combined Indonesia’s climatic and geological characteristics with rainy weather and frequent earthquakes, and used safety risk monitoring systems and disaster prevention equipment to strengthen monitoring of train operations and related equipment, and conducted emergency joint drills with relevant Indonesian departments to ensure safe and smooth operation of the line.(Headquarters reporter Li Lin)

Service Hotline